Reformer Pilates studio, Warwick

Internal walls out and the ceiling raised for a new reformer Pilates studio, finished with a plastered lighting halo.

Sector
Commercial
Our scope
Walls out, ceiling raised, halo
Location
Warwick
Four stages on site

Opening up the room.

Internal walls taken out, leaving an open floor
01Walls outInternal walls removed
The old ceiling opened up to the structure above
02Ceiling openedDown to the structure
The new raised ceiling framed and boarded with a recess for lighting
03Ceiling raisedFramed and boarded higher
The finished lighting halo glowing around the raised ceiling
04HaloFormed, plastered and lit

The brief

We were contracted to remove some internal walls and raise the ceiling to create the space for a new reformer Pilates studio.

With the walls out and the ceiling lifted, we formed a halo for the lighting and plastered it, giving the studio its soft, even glow.

Works schedule
  • W1Internal walls removed
  • W2Ceiling raised
  • W3Lighting halo created
  • W4Plastered throughout

Planning something similar? Tell us about it.

Call Email us
Email us

Tell us about your project.

What's it for? Pick any

Only used to reply to you. Privacy

Prefer your own email app? info@fgsheridanconstruction.com