Oakfield House, Dorridge

Partitioning and drylining for a nine-apartment build in the centre of Dorridge.

Sector
Residential
Size
9 apartments
Our scope
Partitioning, drylining
Location
Dorridge, Solihull
Finished communal corridor at Oakfield House with crisp drylined walls and an LED cove ceiling
Communal corridor, finished

The brief

We were contracted to complete all the partitioning and drylining across nine apartments in the centre of Dorridge.

Every partition was built to the architect's drawings. The ceilings were insulated and resilient barred before the whole building was plasterboarded.

Works schedule
  • W1Partitions constructed to architectural drawings
  • W2Ceilings insulated throughout
  • W3Resilient bars fixed to all ceilings
  • W4Plasterboard throughout the building
Services on this job
Three stages on site

Frame, board, finish.

Metal stud partitions and ceiling channels set out across an open floor
01FrameStuds and channels set out to the drawings
A corridor fully boarded with plasterboard before finishing
02BoardInsulated, barred and boarded
A finished open-plan apartment living space with clean walls and ceilings
03FinishReady for the next trades

Planning something similar? Tell us about it.

Call Email us
Email us

Tell us about your project.

What's it for? Pick any

Only used to reply to you. Privacy

Prefer your own email app? info@fgsheridanconstruction.com